Skip to main content
Back to BlogEnterprise AI

Air-gapped LLM deployment: what changes with no internet

Air-gapped LLM deployment: what changes with no internet. Model transfer, updates, logs, embedding refresh and monitoring, with a checklist.

BiltIQ AI
6 min read
Air-gapped LLM deployment: what changes with no internet

An air-gapped LLM deployment runs the model, the documents and the agents on a server with no route to the internet. What changes is everything that normally arrives over a wire: model weights, updates, monitoring, and the embeddings that make your documents searchable. BiltIQ AI Factory runs on-premise by design; Agent OS's on-prem-required mode refuses any outbound host. The air gap itself is yours to build and to agree in writing.

At a glance

Point Detail
Who needs it Defence, DPSUs, some PSUs and departments where no outbound path is allowed
What BiltIQ ships Models on your GPU server; in on-prem-required mode no outbound host can be allowed; an unconfigured install blocks all outbound calls
What the air gap changes Model transfer, updates, monitoring, log review, embedding refresh, warranty claims
Default model for defence and PSU NVIDIA Nemotron; model origin checked under Public Procurement Order No. 1
What to agree in writing How updates and monitoring reach a server with no path in

What is the difference between on-premise and air-gapped?

On-premise means the model and the documents are on your server. Air-gapped means the server also has no network route out. BiltIQ's security gate gives the first: outbound calls blocked by default, an admin allowlist you are shown, or on-prem-required mode where no host can be allowed at all. The second is a property of your network, not of the software. Most government and defence buyers want both.

What changes when nothing comes in or goes out?

Normally In an air gap
Weights are pulled onto the server Weights arrive on verified media, checked against a hash before loading
Platform and security updates are installed remotely by BiltIQ Updates are packaged, carried in, and installed on site; the cadence is written into the contract
Remote health monitoring, with your permission and no document access No remote path. Health is read on site, or exported as reports on a schedule you set
Agents re-index documents as they change Re-indexing runs on the box; new document batches are carried in the same way
Logs are reviewed in the quarterly health and usage review Logs stay inside; the review happens on site or from exported logs
GPU warranty claim goes through the OEM remotely The card is physically removed and shipped; the site runs on the remaining GPUs
Time sync from the network A local time source, or the audit trail drifts

A checklist before you commit to an air gap

  1. Model transfer. Who signs off the weights, which hash is checked, where the media is kept.
  2. Model origin. For defence and PSU, settle the model first. NVIDIA Nemotron is BiltIQ's default; no China-origin model in defence deployments.
  3. Update cadence. Monthly, quarterly, or on security notice; who carries it in; who installs.
  4. Monitoring. With no remote path, name the person who reads health on site, and what gets exported.
  5. Embedding refresh. How new documents are loaded and re-indexed, and how old versions are retired.
  6. Logs. Where they live, who reviews them, how long they are kept.
  7. Approvals. The approval inbox still needs a named reviewer; with none, actions are blocked.
  8. Warranty. Who removes a failed card, who ships it, and the fact that no spares are held.
  9. Pilot. Run the paid pilot the same way, on past files, under NDA, so the air gap is tested before the licence.
  10. Exit. Open-weight models and your own server mean nothing has to be returned; write it down anyway.

What does BiltIQ do, and what stays with you?

  • BiltIQ: installs AI Factory and Agent OS on your GPU server, serves open-weight models, sets on-prem-required mode so no outbound host can be allowed, runs the paid pilot on your past files.
  • You: the network boundary, the media handling, the on-site hands for updates, and the person who owns the approval inbox.
  • Agreed in writing: how updates and monitoring reach a server with no path in, because the standard managed service assumes remote monitoring with your permission.

How is a model update carried in, step by step?

  1. Package. BiltIQ prepares the update (model weights, platform or security update) and records its hash.
  2. Transfer. The package goes onto media your rules allow, signed out by a named person.
  3. Verify. On site, the hash is checked before anything is installed.
  4. Install. In the agreed window, by the on-site hands, with BiltIQ on a call if your rules allow a phone.
  5. Check. A fixed set of test documents runs through the agents; results are compared with the previous run.
  6. Log. What was installed, by whom, when, with the hash, kept on the server and in your change record.

The same path, in reverse, carries exported health reports and logs out for the quarterly review, if your rules allow anything out at all.

What goes in the tender for an air-gapped site?

  • The software must run with no outbound host allowed, and the vendor must show the setting.
  • Model origin must be stated for every model, including the vision and embedding models.
  • Updates must be deliverable on media with a verifiable hash.
  • Monitoring must be possible on site with no remote path.
  • The approval record must stay on the server.
  • The pilot must run on past files the same way the production system will.

Why does time matter in an air gap?

Without network time, server clocks drift. Approval records and logs carry timestamps; a drifted clock makes the audit trail hard to defend. Give the server a local time source and check it in the quarterly review. It is a small item that becomes large in an audit.

When should you NOT air-gap?

  • A security gate is enough. If an admin allowlist with no document path satisfies your rules, on-premise with the gate is simpler to run.
  • No on-site hands. An air gap without someone to carry updates in becomes an un-updated server.
  • Your documents change daily. Carrying batches in on media is fine weekly, painful hourly.
  • You need the Subscribe tier. That runs on BiltIQ's cluster, by definition not air-gapped.

One decision to make early

Decide whether the site is air-gapped or gated before the pilot, not after. A gated site can become air-gapped later, but the managed service, the update path and the monitoring are all agreed differently, and the pilot should run the way production will.

Frequently asked questions

Can BiltIQ's agents run without calling outside servers?

Yes. The security gate blocks outbound calls by default, an unconfigured install blocks all outbound calls, and in on-prem-required mode the configuration refuses any allowed outbound host. The models run on your own GPU server.

How do updates reach an air-gapped server?

On media, installed on site. The standard managed service installs updates remotely, so the cadence and the hands for an air-gapped site are agreed in writing before the licence.

Which model is used for defence?

NVIDIA Nemotron by default for defence and PSU; no China-origin model in defence deployments. Outside defence you choose the model.

Related: How much does an on-premise AI server cost in India in 2026? · Sovereign AI procurement: a 10-point checklist for PSUs · Why Nemotron is BiltIQ's default model for defence and PSU

Next step: government and PSU; book the paid pilot on contact.

Facts checked against the BiltIQ product pages, 5 November 2026.

AI FactoryAir-gapped AIOn-Premise LLMDefence AI
👨‍💻

BiltIQ AI

BiltIQ gives every organisation its own AI: own it on your servers, or subscribe to ours in India.

Contact our team →
Share this article:

Book an Architecture Consultation

30 minutes. No sales pitch. We assess your stack, find where agentic AI creates measurable value, and give you a concrete deployment path.

Your Data. Your Premises. Your AI.